The first in Russia full-cycle enterprise for the production of disposable nitrile gloves will be established in the Samara region. This fact has a fundamental importance for technological development and promotion of competitiveness of regional and domestic production, and will contribute to revival and quality improvement of medical products manufacturing in Russia.
IMPLEMENTED PROJECTS
.png)

The interconnected projects of Aquabiototech and Volga industrial technologists provided for the creation of an industrial park in the field of aquaculture and the organization of fish processing production in the urban settlement. Mezhdurechensk Samara Region. Both projects are currently completed.

The logistics postal center is located in the industrial park "Preobrazhenka" in the territory of the Volzhsky district and has an automated sorting of mail and warehouse areas for storing and processing orders.

In April 2019, a test launch of the production of composite materials using hot pressing technology (SMC, BMC, DMC) took place, and in October 2019, the PM-Composite was officially opened and put into pilot production in the territory of the Togliatti SEZ with the participation of the Governor of the Samara Region







The beginning of the facility's activity is on May 21, 2019.
Number of jobs - 70
Investor-IP "Trachtenberg A. Yu."
A concession agreement has been concluded (29 years)







The facility began operations on September 15, 2016.
Number of jobs - 29
Investor - Fresenius Medica Kea Holding LLC
Cooperation Agreement concluded


The project implementation involves the construction of an agroindustrial park in Samara, which should include the objects of production, logistics and trade infrastructure. The main specialization of the complex includes agricultural products and food products. The first and second stages of «Samara» agro-industrial park were put into service. Preparations for the implementation of the third construction stage is in progress.


Organization of production of new floor coverings with improved performance characteristics

Завершен капитальный ремонт двух агрегатов по выработке карбамида общей мощностью 3000 т/сут. Ведутся работы по получению разрешительных документов на строительство объекта "Агрегат карбамида 2200 т/сут»

Investment phase is finished


The concept of the project provides for the creation of a health and recreation center for the whole family, offering a variety of types of saunas and baths, an open-air thermal pool, anti-aging, therapeutic and preventive procedures
.png)
As a result of this project, the imported technology of mass production of reinforced concrete products will be localized, this technology being innovative for this market in the Russian Federation. The project complies with the BAT (Best Available Techniques) principles and has many advantages in terms of resource and energy saving, labor and environment protection.

Carrying out work on the repair of industrial premises, providing the property complex with the necessary engineering infrastructure. Preliminary recruitment of staff.

Construction of a cowshed building No. 4 for 400 livestock places with a milking and dairy unit and administrative and residential complex in the village. Nizhnee Sancheleevo, Stavropol district, Samara region (implemented).

The project is for the organization of the Corporate Center to provide services to customers of PJSC “Sberbank”. The project includes reconstruction of an unused office space of PJSC “AVTOVAZ” with a territory of 7,600 square meters (Togliatti, 26 Transportnaya Street).
Main indicators and functions of the Corporate Solutions Center:
• Processing of up to 11,000,000 phone calls per year.
• Operative consulting and pre-action resolution of customers’ complaints in the CSR
• Improve efficiency of work of the first line, a step towards fully remote servicing and sales.
• Focus on corporate culture and on the digital.
• Availability: 24/7 instead of ‘working hours’.
• Cross-sales depending on customer’s needs in all lines.
• Storage and analysis of history of contacts with the customer.
• Telemarketing and support functions united in one center.
• Faster implementation of changes, flexible management of resources.

The project is for organization of an own raw material base and facilities for the storage/processing of apples to make apple juice concentrate to be used in making juice products. The main types of manufactured products will be apples, young apple tree plants, concentrated apple juice and juice products.

The implementation of the project involves installation of a solar park with a capacity of 75 MW (three stages with a capacity of 25 MW) as part of fulfillment of obligations under the agreements concluded by LLC “Solar Systems” on the provision of generating facilities using renewable energy sources.

Construction of additional production facilities with refrigerating equipment to enlarge the existing vegetable storehouses.

Construction of additional production facilities with refrigerating equipment to enlarge the existing facilities.

According to the plan, the facility for oil refining, deodorization and bottling shall be built in the municipal district Bezenchuksky of the Samara region.
The facility under construction is intended for further processing of crude oil.
The planned equipment provides for processing of all types of oil with the capacity of 300 tons of oil per day. This allows to produce a maximum of 102 thousand tons of refined, deodorized and bottled oil per year.